GAS

MEO’s NWS seismic survey on track

OPERATOR MEO Australia and Cue Energy are about half way through a 133 square kilometre 3D seismic survey across their WA-360-P and WA-361-P permits on the North West Shelf.

MEO’s NWS seismic survey on track

MEO told the market that as of yesterday, the M/V Orient Explorer seismic vessel had acquired 52% of the data and the survey was on track for completion by next Thursday, December 27.

Part of the new 3D survey covers the large Zeus feature in WA-361-P, believed by MEO to be a stratigraphic trap similar to the nearby Perseus Gasfield, while the remainder covers a further stratigraphic lead (W07-E) in WA-360-P.

This mapping is expected to bring the Zeus prospect into drill-ready status.

Once this survey is complete, the vessel will move to MEO’s third North West Shelf permit, WA-359-P, to acquire 250 km of 2D data.

MEO is earning operatorship and a 60% stake in each of the three blocks, by agreeing to fund the seismic and drilling costs.

Post farm-in, Cue's stake will be reduced to 20%, while the other partners in the blocks are Exoil and Gascorp.

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry